Wall-Hung WC and Concealed Cistern — Öz İnan Yapı

Frame, pipework and plate with the same crew. Inner-kit repair is a separate page; this page is install and renewal.

Typical duration

1 day (shorter if the frame is ready)

A concealed cistern is box height, inlet and waste invert. A wrong box means break-out later. A sound box can take a new kit and pan. Leak suspicion gets detection first.

Wall-hung toilet and concealed cistern — Öz İnan Yapı

How pricing works

Survey and measuring are free
We come to the address and inspect the plumbing on site. The age of the building, the state of the pipework and whether the fault is inside the flat or in the shared stack all become clear at this stage.
The figure is agreed before work starts
We tell you what will be done and what it costs first. Nothing is stripped, cut or replaced before you approve.
We don't publish a fixed price list
The same job varies with the age of the building, how accessible the pipework is and which materials are used. Rather than posting a misleading headline price, we measure on site and tell you then.
Materials from our own store
We bring parts from our building materials store in Namık Kemal, so you don't lose a day to a second trip.
Describe the problem by phone

Common questions

Convert a floor pan to wall-hung?+

Only if the wall and runs allow it — not every flat.

Repair without breaking the wall?+

The plate comes off for the kit. A rotten frame is a different job.

Still hissing?+

Float or seal — the repair page first. Install faults we check here.

Whose materials?+

Our shop or your brand, matched on survey.

Areas?+

Esenler and five neighbouring districts.

Districts we do this work in

Related plumbing service

Bathroom Plumbing and Repair

Other decoration jobs

All decoration
Quick Call