Kitchen Renovation — Öz İnan Yapı

Cabinets, worktop, sink and pipework as one plan. We do not hand the plumbing to a second crew; materials from our shop.

Typical duration

2–5 working days by scope

Points for water, waste and mixer are locked first. Cabinets sit on that. An old leaking sink or blocked waste is cleared before the refit. This is in-flat kitchens, not a whole-building canteen.

Modern renovated kitchen — Öz İnan Yapı decoration and renovation

How pricing works

Survey and measuring are free
We come to the address and inspect the plumbing on site. The age of the building, the state of the pipework and whether the fault is inside the flat or in the shared stack all become clear at this stage.
The figure is agreed before work starts
We tell you what will be done and what it costs first. Nothing is stripped, cut or replaced before you approve.
We don't publish a fixed price list
The same job varies with the age of the building, how accessible the pipework is and which materials are used. Rather than posting a misleading headline price, we measure on site and tell you then.
Materials from our own store
We bring parts from our building materials store in Namık Kemal, so you don't lose a day to a second trip.
Describe the problem by phone

Common questions

Sink only or full kitchen?+

Split on survey. Sink-mixer is short; cabinets and top are renovation.

Can we stay home?+

Usually yes. Water cuts are planned in the day.

Price list?+

No. Free survey, amount before we start.

Separate plumbing invoice?+

Same crew, one survey. Lines split in writing.

Areas?+

Esenler and five neighbouring districts.

Districts we do this work in

Related plumbing service

Kitchen Plumbing

Other decoration jobs

All decoration
Quick Call