| Drain Cleaning / Unclogging | Professional unclogging and cleaning for sinks, toilets, drains and sewers. | 30–90 minutes (depending on the blockage) |
|---|
| Sink Unclogging | Mechanical clearing of basin traps and waste — no harsh chemicals. | 30–60 minutes depending on the blockage |
|---|
| Toilet Unclogging | WC and outlet unblocking with cable and camera. | 30–90 minutes |
|---|
| Kitchen Drain Unclogging | Grease and sink-waste clearing, smell and overflow checks. | 45–90 minutes |
|---|
| Sewer Unblocking | Stack and sewer unblocking with camera and mechanical tools. | 1–3 hours depending on access |
|---|
| Shower Drain Unclogging | Shower gully, trap and horizontal waste clearing. | 30–75 minutes |
|---|
| Drain Camera Inspection | CCTV inspection that narrows where we open up. | 45–120 minutes |
|---|
| Tap Repair | Drips, washers and cartridges repaired on site. | 30–90 minutes |
|---|
| Mixer Installation | Kitchen and bath mixer fitting with a leak test. | 45–120 minutes (concealed sets need a survey) |
|---|
| Trap Repair | Basin and sink trap leaks, seals and body swaps. | 30–60 minutes |
|---|
| Cistern Repair | Close-coupled and concealed cistern kits, floats and seals. | 45–120 minutes (concealed may need a survey) |
|---|
| Pipe Repair | Local waste and olive repairs, handed over on a pressure test. | 1–3 hours |
|---|
| Valve Repair | Flat stopcock and angle-valve repair or swap. | 45–120 minutes |
|---|
| Sanitary Plumbing | Hot/cold, waste and fittings: survey, materials, same crew. | Survey 30–60 min; in-flat renewal 2–5 working days |
|---|
| Bathroom Plumbing and Repair | Bathroom plumbing repair and renovation with quality materials and craftsmanship. | Half a day – 2 days (depending on scope) |
|---|
| Kitchen Plumbing | Kitchen sink, faucet and plumbing installation / repair solutions. | 1–4 hours (single point); 1 day for a re-pipe |
|---|
| New Plumbing Installation | New-build and gut-out hot/cold and waste first fix. | 2–6 working days by flat size |
|---|
| Pipe Replacement | Replacing rotten galvanised and collapsed waste runs. | 1–4 working days by run length |
|---|
| Water Leak Detection | Instrument-assisted leak detection to locate issues with minimal demolition. | 1–3 hours (detection + local repair) |
|---|
| Emergency Plumbing Service | Fast response for flooding, burst pipes and emergency plumbing situations. | Dispatch depends on queue and traffic; on-site work usually 1–2 hours |
|---|
| Burst Pipe | Shut the valve and repair a burst on the spot. | Dispatch by queue; on-site usually 1–2 hours |
|---|
| Flood Response | Shut-off, drain and source-finding when a flat floods. | Shut-off and first drain 1–2 hours; source repair separate |
|---|
| Underfloor Heating Systems | Installation, inspection and maintenance support for underfloor heating systems. | Maintenance 2–4 hours; new install 2–4 days (by area) |
|---|