Laminate Flooring and Door Replacement — Öz İnan Yapı
Floor and interior doors finish in one handover. Underfloor heating under the boards gets a check first.
Typical duration
1–3 working days by area
Laminate does not sit on a wet slab; a leak is stopped first. Door linings and leaves are measured on site. Our Merter floor-and-door job is published. This is not sanitary plumbing; wet rooms sit on the other decoration pages.

How pricing works
- Survey and measuring are free
- We come to the address and inspect the plumbing on site. The age of the building, the state of the pipework and whether the fault is inside the flat or in the shared stack all become clear at this stage.
- The figure is agreed before work starts
- We tell you what will be done and what it costs first. Nothing is stripped, cut or replaced before you approve.
- We don't publish a fixed price list
- The same job varies with the age of the building, how accessible the pipework is and which materials are used. Rather than posting a misleading headline price, we measure on site and tell you then.
- Materials from our own store
- We bring parts from our building materials store in Namık Kemal, so you don't lose a day to a second trip.
Common questions
Laminate over underfloor heating?+
By the board rating and surface temperature. We say so on survey.
Lift the old floor?+
Yes — rubble scoped on survey.
Doors only?+
Yes. Floor and doors can be together or apart.
Laminate in a wet room?+
We do not recommend it in bath/WC. Rooms and halls.
Areas?+
Esenler and five neighbouring districts.